Road construction

Extreme dirt accumulation is no problem for cable carrier

Industry: Road construction

Energy Chain®: 2 x Series 48 "E2 tube"

Travel: 46 feet

Speed: 3 ft/s

Acceleration: 3 ft/s2

Filling: 0.5 lbs/ft


This vehicle paves roads with asphalt concrete. An Energy Chain® cable carrier supplies the front end of the vehicle with bitumen and is exposed to extreme dirt as a result.

cable carrier for road construction application  
More product information
More application examples

Subscribe to
e-newsletter
Contacts in your location (can be on-site within 24-48 hours)

myigus myCatalog
No minimum order
On-site and telephone support Delivery from 24h* Free samples

About Energy Chains®Product OverviewProduct Selector3D-CAD libraryPart No. searchRequest a quoteCatalog/sample requestEmail the product expertApplication examplesAssembly InstructionsVideosTechTalk Design Advice SeriesDownloads

More than 100,000 products available! Open Mon-Fri 8:00 am - 8:00 pm EST.
No minimum order

Terms and Conditions Imprint General Information Data Privacy Protection Declaration